00 — Overview
Work & Supply network member (Step 7 of the asset-condition programme). The demo data is fictional; the Work templates are Work's own cumulative service tiers.
What Scheduled Maintenance is
A plan says what is required for a maintenance group (and optionally an SMCS code), how often (its triggers) and which Work template to use. An item is the live state of a plan on one unit: when it was last done, when it is next due, whether work has been raised. There is no plan type: the Work template carries the work type (service, inspection, statutory ...) and the tasks, and a sample is just a task in the template.
The models
- MaintenancePlan — code, name, maintenance group (it covers the child groups; no group means no units), an optional SMCS
code (the plan applies only to units that have that SMCS fitted), the Work template,
lead_days(raise the work this many days before it is due),tolerance_days(grace past the due point before overdue) andfixed_cycle. - PlanTrigger — several per plan, "250 h or 3 months, first reached":
meter(which meter, the interval),calendar(days),fixed_date(day and month) orlife(follows Lifecycle's forecast for the SMCS on the unit). - PlanInclusion — a larger service covers a lesser one (1000 h covers 500 h and 250 h).
- ScheduleItem (
schedule.item, SI-…) — the unit, the plan (empty for a one-off from a condition finding, a life forecast or by hand), last done, next due (the earliest across the triggers), status, forecast confidence, the per-trigger detail, the Work order, the item it was incorporated into, and any deferral.
The demo data (3 Oct 2026)
| Unit | Items |
|---|---|
| TRUCK-09 (50 010 h) | 250 h service in work (WO-1002); 500 h service due soon; 1000 h, the March inspection and the transmission change-out not due |
| TRUCK-21 (17 470 h) | 250 h service overdue (11 days late, 3 days' tolerance); the rest not due; the transmission change-out follows Lifecycle's forecast for 12 Nov |
| TRUCK-17 (in repair, meter quiet since 22 Sep) | 250 h service deferred to 20 Oct; the rest not due, with low forecast confidence |
The plans: 250 h (or 90 days), 500 h and 1000 h services, an annual inspection each 15 March (a placeholder Work template) and a transmission change-out for SMCS 3030, all for the "793F haul trucks" group.